Bär Cargolift freight elevator factory
<<< Back

Studio: 2L Architects
Authors: Julius Lapinskas, Gabrielė Liucija Ošikaitė, Simonas Norkus, Jevgenij Kuzmin, Povilas Maksimavičius
Type: Object
Class: Mutifunctional
Address: Aviacijos g. 16, Šiauliai
Year: 2021 m.
Comments: 0
Photographer: Aistė Rakauskaitė Photography



About:
The new 9500 m2 Bär Cargolifts’ factory was built on
3.5 h of land. It has an A++ energy efficiency rating and
is equipped with a special heating system, which uses
less than 15 kWh of energy per year per square metre.
Bär Cargolift has vowed to only purchase electricity
from renewable energy sources. A significant proportion
of such energy is generated on the 185 kW solar
rooftop. This project was brought to life very quickly –
the construction permit was received in 7 months after
signing the contract with Šiauliai FEZ and the whole
project with construction took only 14 months.

<<< Back


<<< Back



Generalinis rėmėjas



Organizatorius


2022 © LIETUVOS ARCHITEKTŲ SĄJUNGA. VISOS TEISĖS SAUGOMOS.
DIZAINAS: PRIM PRIM | SPRENDIMAS: RAIMUNDAS VEIKUTIS